Recent Commercial Projects - Operable Walls
image-1381007-Sensis2.jpg

Operable Walls @ University of Western Sydney - Rydalmere
Gledhi
ll Constructions
December 2010

image-1381007-Sensis2.jpg
Operable Walls @ University of Western Sydney - Rydalmere
16 Panels x 120 meters of tracking system to be used as an Art Display Area
in several rooms
image-1381007-Sensis2.jpg

Operable Walls @ University of Western Sydney - Rydalmere
Gledhill Constructions
December 2010

image-1381007-Sensis2.jpg
Operable Walls @ Narellan Police Station
Due to the small size of the lift/fire stairs
this wall was craned in through a window area by Murano Walls Crew 
image-1381007-Sensis2.jpg
Operable Walls @ Schneider Electrical - Macquarie
Buildcorp Interiors
February, 2011
image-1381007-Sensis2.jpg
Operable Walls @ Schneider - Macquarie
4 Walls x 28 Panels craned in by Murano Walls
 Note the crazed glass panel which reflects the pattern found on the Operable Wall finishes
image-1381007-Sensis2.jpg
This project entailed a laminate overlay finish, with no exposed frames.  This overlay contributes to a sleek design.  This operable wall has a sound rating of Rw45 which provides sufficient sound proofing for this particular project.  This project for Saatchi & Saatchi was completed in October, 2006.
image-1381007-Sensis2.jpg
image-1381007-Sensis2.jpg
image-1381007-Sensis2.jpg

​Halinda High School - Builder - St. Hilliers
image-1381007-Sensis2.jpg
Halinda High School is part of the NSW Government Schools Project in developing more education in the Western Suburbs. 

St. Hilliers chose Murano Walls for this project, for their vast experience and knowledge, and previous track record on such sites.  This project is in two stages for Murano Walls and is now nearing completion for St.Hilliers.

Photograph taken November, 2006.
image-1381007-Sensis2.jpg
Each "Murano" operable wall and accordion door requires structural support, supplied by St.Hilliers, for Murano to install our headwork and tracking system.
image-1381007-Sensis2.jpg
Hardwood headwork is installed by using "rods" through the steel support head supplied by St.Hilliers and their structural engineers.   Once completed the plastering can take place around the operable wall opening.
image-1381007-Sensis2.jpg
Murano's aluminium track is then installed to the suspended hardwood headwork.
image-1381007-Sensis2.jpg
Halinda High School Operable Wall Panels by Murano Walls with full height Fabric Pinboard to enhance the class room.  The acoustic rating on this wall is Rw42.  This rating is above the required rating as set by the Department of Commerce.
image-1381007-Sensis2.jpg
Easy access between the classrooms at Halinda High School can be achieved by a full height access door by Murano Walls.
image-1381007-Sensis2.jpg
Acoustic Accordion Doors were supplied and installed for this project for ease of access in the administration building.
image-1381007-Sensis2.jpg
These Accordion Doors are sound rated at STC 38 with a vinyl finish.